CHN Power has revealed the outcomes of its latest 10 GW photo voltaic module procurement tender, with Longi (3.21 GW), Tongwei (740 MW), Astronergy (2.49 GW), and JinkoSolar (3.56 GW) rising because the winners. The common panel worth within the tender was CNY 1.07 ($0.15)/W, with the bottom worth at CNY 1.05/W.
State Energy Funding Corp. (SPIC) has began working a 5 GW heterojunction photo voltaic cell and module manufacturing unit in Wenzhou, Zhejiang province. The modules from this facility function copper as a busbar materials to save lots of prices, with a median panel energy output in mass manufacturing anticipated to vary between 700 W and 720 W.
JinkoSolar has secured approval from Jiangxi’s department of the Nationwide Growth and Reform Fee for its plan to construct a 1 GW photo voltaic module manufacturing unit within the US state of Florida. The corporate plans to speculate $82.7 million within the mission, outfitting an present manufacturing unit constructing in Jacksonville with fully new gear.
GCL SI has reported CNY 9,412 billion of income for the primary 9 months of this 12 months, up 97.43% from the identical interval final 12 months. Its internet revenue was CNY 142 million, up 240.78% 12 months on 12 months. The module maker mentioned it plans to problem shares to fund a 20 GW cell manufacturing mission in Wuhu, Anhui province.
This content material is protected by copyright and will not be reused. If you wish to cooperate with us and want to reuse a few of our content material, please contact: editors@pv-magazine.com.