17.2 C
New York
Wednesday, October 2, 2024

Port of Lengthy Seaside To Host Occasions Forward of Pier Wind Assessment






The Port of Lengthy Seaside is internet hosting two occasions to supply details about and collect enter for the upcoming Pier Wind environmental evaluate.

The proposed 400-acre terminal could be designed to facilitate the meeting and deployment of offshore wind generators. If permitted, the proposed Pier Wind venture could be the biggest facility of its type on the West Coast, says Port of Lengthy Seaside.

Feedback will likely be gathered for enter concerning the scope and content material of the proposed venture’s upcoming environmental influence report and environmental influence assertion.

Each occasions will begin with an open home, adopted by a scoping assembly. The primary will likely be held on Dec. 13, with the second on Jan. 10. Each occasions will likely be held on the Port of Lengthy Seaside Administration Constructing.

The general public has 45 days to submit feedback earlier than the shut of the remark interval on Jan. 19.








Related Articles

Latest Articles

Verified by MonsterInsights