0.1 C
New York
Sunday, January 12, 2025

Enauta Set To Obtain Key Tools For Atlanta Discipline


The primary multiphase pumping subsea system (MPP), that may help oil and fuel manufacturing on the Atlanta area in Brazil’s Santos Basin, has been shipped from Norway, Brazilian oil and fuel firm Enauta has knowledgeable.

The MPP, manufactured by OneSubsea, was loaded on January 21, 2024, in Norway forward of transport for Brazil.

The supply of the tools in line with the schedule highlighted one of many key challenges to succeed in FPSO Atlanta’s first oil aimed by August 2024, in line with Enauta, which is the operator of the Atlanta area.

“In response to knowledge introduced on the Enauta Day, the efficiency of over 80 MPPs in operation worldwide drives a key differential for the Atlanta area operation,” Enauta mentioned in a press release.

MPP Tools (Credit score: Enauta)

In September 2023, Enauta began the set up works on Atlanta’s Part I, which is able to deliver a bigger capability FPSO to the sector that has to date been producing oil by way of the Petrojarl I FPSO.

The FPSO Atlanta can be equipped by Malaysia’s Yinson Manufacturing and deployed at Enauta’s Atlanta area, with oil manufacturing set to start out in mid-2024 with six manufacturing wells.

FPSO Atlanta has the manufacturing capability of fifty,000 BOPD and a most storage capability of 1,251,000 bbls,

In July 2023, Yinson Manufacturing exercised its choice to buy FPSO Atlanta with a 15-year agency (plus a 5-year extension choice) contract for the availability, operation and upkeep with a complete contract worth of as much as $1.981B in addition to mission financing within the quantity of $400 million.

Yinson Manufacturing just lately held an official naming ceremony for the FPSO Atlanta, stating the engineering, procurement, building, and set up of the FPSO Atlanta is steadily progressing.

Related Articles

Latest Articles

Verified by MonsterInsights