Haewoori Offshore Wind 2 and three, Copenhagen Infrastructure Accomplice’s (CIP) floating initiatives off the coast of Ulsan, Korea, with a 500 MW capability every, have awarded a FEED contract to Aker Options and Precept Energy for floating foundations.
As a part of the scope, Aker Options will coordinate the design and supply of the floating basis buildings and carry out the undertaking’s front-end engineering design of the inter-array cable, marshaling port and wind turbine integration, in addition to transport and set up.
Precept Energy will carry out the design of the floating platforms and mooring system primarily based on its WindFloat know-how. Aker Options will even perform execution planning, and work with the undertaking to have interaction the native provide chain.
After a sturdy choice course of, we’re completely satisfied to collaborate with Aker Options and Precept Energy for the FEED for the supply of floating buildings,” says Jonathan Spink, CEO of Haewoori Offshore Wind. “The mixed technical experience and know-how of Aker Options and Precept Energy will present us with the capabilities to ship one of many first industrial scale floating wind initiatives on the earth.”
Work will begin instantly on FEED and is because of be accomplished by November.