19.1 C
New York
Friday, September 27, 2024

Meta inks take care of Pine Gate for brand new 204-MW photo voltaic venture


Share

Pine Gate Renewables and Meta introduced the execution of an settlement for the renewable attributes from a Pine Gate photo voltaic venture positioned in Temple, Texas. The 204-MW Limewood Bell Photo voltaic Undertaking in Bell County is predicted to be operational in 2026 and is positioned simply seven miles away from Meta’s Temple Information Heart. The venture is vital to Meta’s continued dedication to internet zero emissions and 100% renewable vitality for its international operations.

Pine Gate prioritizes flexibility, proactive communication and clear growth in its partnerships to assist giant vitality clients notice their sustainability objectives. This new settlement doubles down on an present partnership between Pine Gate and Meta and is the primary between the 2 entities for renewable attributes from a photo voltaic venture in Texas.

“We’re excited to associate with Pine Gate to convey this venture to the grid in assist of our sustainability objectives,” mentioned Urvi Parekh, head of renewable vitality for Meta. “This venture will assist us proceed our dedication to assist all of our operations, together with our Temple Information Heart, with 100% renewable vitality.”

Information merchandise from Pine Gate Renewables

Related Articles

Latest Articles

Verified by MonsterInsights