23.4 C
New York
Wednesday, September 18, 2024

Geothermal wells for emergency heating drilled in Suðurnes area, Iceland



Svartsengi geothermal energy plant, Iceland (supply: ThinkGeoEnergy)

ISOR has drilled wells to produce geothermal heating to the Suðurnes area in Iceland, ought to the Svartesngi geothermal plant fail as a result of volcanic exercise.

Three wells have been drilled to produce heating to the Suðurnes / Southern Peninsula Area in Iceland ought to the Svartsengi plant fail as a result of steady and protracted volcanic exercise. These outcomes by Árni Magnússon, CEO of Iceland GeoSurvey (ISOR).

The drilling of three analysis wells in Miðnesheiði was began in February 2024 an emergency response when a pipeline from Svartsengi broke and minimize off heating provide in Suðurnes. ISOR was employed by the federal government to do the exploration, and the places of the wells had been decided based mostly on geological indicators, in addition to hazards and proximity to current infrastructure.

All three of the wells turned out helpful, however one specifically yielded very optimistic outcomes. The flowrate and warmth from the nicely can be sufficient to produce heating to Suðurnes, even when Svartsengi is unable to supply any heating. Thus, the hazard of not having any heating in Suðurnes has been averted.

In line with Magnússon, additional work can be performed to judge the entire measurement of the newly found geothermal useful resource. There can be extra detailed measurements performed on the drilled wells whereas work proceeds on making ready the pipes, pumps, and warmth exchangers to make the most of the wells.

“That is in fact very satisfying, but in addition irrespective of how issues develop, there’ll at all times be a use for this water and we’ve not stopped wanting,” mentioned Guðlaugur Þór Þórðarson, Minister of the Setting, Vitality and Local weather. “It is a precedence for us, there had not been a geothermal exploration effort on this century. That’s why we lobbied for it, as a result of that is certainly a very good funding for the Icelandic individuals.”

There was some work performed in increasing the capability of the Svartsengi geothermal pow plant with a brand new 22-MW Unit 7. There was no phrase but on the standing of this effort within the face of volcanic exercise.

Supply: RUV.is



Related Articles

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest Articles

Verified by MonsterInsights