-9.4 C
New York
Monday, December 23, 2024

Second effectively drilled for geothermal heating in Sochaczew, Poland



The second effectively for the geothermal heating mission in Sochaczew, Poland has been drilled, and the mission will proceed to development of floor services.

Drilling and testing of the second effectively for a deliberate geothermal heating mission in Sochaczew, Poland has been accomplished. Additional testing will nonetheless be performed on the wells earlier than the mission proceeds to the development of the transmission networks and the heating plant.

In late 2023, town of Sochaczew obtained PLN 62 million (USD 15.63 million) in funding from the Nationwide Fund for Environmental Safety and Water Administration (NFOSiGW) for the drilling of a second effectively and the development of a heating plant. The funding is cut up between a PLN 33.4 million non-refundable subsidy and a PLN 28.6 million low-interest mortgage.

The second effectively geothermal effectively, GT-2, was drilled by Exalo Drilling since August 2024 to a depth of 1620 meters. Testing of the effectively indicated an outlet temperature of 44.5 °C, a flowrate of 184 m3/hour, and good injectivity.

The primary analysis effectively, GT-1, in Sochaczew was drilled at Okrezna Avenue through a PLN 10 million subsidy. Since this effectively was drilled again in 2018, the Przedsisbiorstwo Energetyki Cieplnej Sochaczew (PEC Sochaczew / Thermal Power Firm) wish to take a look at its flowrate and injectivity once more to be sure that it has retained its unique parameters.

The purpose is for each wells for use interchangeably as both manufacturing or reinjection wells. It will permit for the servicing of 1 effectively with out dropping productiveness for the system.

The following section of the mission is to attach all municipal boiler rooms to permit for geothermal warmth to be provided to the entire metropolis heart and all main housing estates.

Supply: Tu Sochaczew



Related Articles

Latest Articles

Verified by MonsterInsights