Studying Time: 1 minutes
Adani Electrical energy Mumbai Restricted (AEML) has formally launched a young inviting bids for the provision of 600 megawatts (MW) of wind energy from grid-connected initiatives. This initiative is a part of a tariff-based aggressive bidding technique aimed toward integrating extra renewable power into Mumbai’s energy grid. The tender seeks to draw potential builders to contribute to the rising demand for clear and sustainable power within the area, marking a major step ahead in AEML’s dedication to environmental sustainability and renewable power adoption.
The tender paperwork is accessible for procurement from March 1, 2024, at 15:00 RTZ, with the window closing on April 2, 2024, at 15:30 RTZ. These paperwork might be acquired on-line with a charge set at 29,500 Indian Rupees for each home and worldwide bidders.
A further tender-processing charge of 354,000 Indian Rupees is required to be paid to the customer group. Moreover, a bid safety, or Earnest Cash Deposit (EMD), of 12.64 Lakhs per MW per mission, is necessary for all contributors. The pre-bid assembly, scheduled for March 14, 2024, at 15:00 RTZ, is non-obligatory for bidders.
The ultimate date for bid submission is April 2, 2024, by 16:00 RTZ, and the tender opening occasion is ready to happen on April 5, 2024, at 13:00 RTZ. All submissions and the tender opening can be carried out on-line. Moreover, a non-refundable ETS Bidding-Charge of 30,000 Indian Rupees, excluding Items and Providers Tax (GST), is relevant. This initiative marks a major step in direction of India’s dedication to renewable power and sustainability.