From pv journal France

France’s Ministry of Ecological Transition has revealed the outcomes for the second spherical of a technologically impartial tender for hydro, wind, and solar energy initiatives.

Neoen got here second with 104 MW, damaged down into 4 initiatives starting from 14.4 MW to 30 MW, with commissioning to happen between 2025 and 2028. Three of the initiatives are agrivoltaic installations on farms.

BayWa re got here third with 77 MW. It was adopted by Urbasolar (44.4 MW), Enertrag (39.9 MW), Générale du Solaire (23 MW), Sipenr (22.3 MW), TotalEnergies (21.7 MW). Under 20 MW, initiatives have been received by Corsica Sole, RWE (with 11 MW of wind and 4 MW of photo voltaic), Nouvergies, ib vogt, Voltalia, and Components.

The deadline for the subsequent interval is Aug. 9, 2024, for 500 MW. With PV, 70% of the rating corresponds to the value, 16% to the carbon footprint, 9% to the environmental affect and 5% to crowdfunding.

This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: editors@pv-magazine.com.