The Moroccan Company for Sustainable Power (Masen) has printed an inventory of the pre-qualified bidders for the tender for the Noor Midelt III mission – a 400 MW photo voltaic plant that might be related to 400 MWh of battery storage.

The record consists of:

The tender was initially launched in early August. The mission will elevate the photo voltaic capability of the Noor Midelt mission, which additionally consists of the Noor Midelt I and Noor Midelt II photo voltaic vegetation, to 1.6 GW.

In July, Masen printed the record of the 24 bidders which can be competing to construct the Noor Midelt II mission. deliberate for the Drâa-Tafilalet area in northeastern Morocco, could have 400 MW of capability. It’s going to embrace a battery, with two hours of storage.

The Noor Midelt I plant, an 800 MW photo voltaic plant combining concentrated solar energy (CSP) and PV with 5 hours of storage capability, is to be constructed and operated by EDF Renewables (35%), Abu Dhabi Future Power CO (30%), Masen itself (25%) and Inexperienced Of Africa (10%).

This content material is protected by copyright and will not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: editors@pv-magazine.com.