Studying Time: 1 minutes
NTPC Restricted, a distinguished authorities enterprise, has initiated an Worldwide Aggressive Bidding course of for the collection of wind energy turbines to provide 1000 MW of energy from ISTS-connected wind energy tasks in India. This important transfer, often known as NTPC-Tranche-III, is carried out on a Construct-Personal-Function (BOO) foundation.
The Invitation for Bids (IFB) issued by NTPC invitations eligible bidders to take part on this course of, which follows a Single Stage Two Envelope construction consisting of a Technical Bid (Envelope-I) and a Monetary Bid (Envelope-II).
events can entry detailed phrases and circumstances within the Request for Choice (RfS) paperwork which can be found for examination and downloading on the e-Tender Portal. The timeline for key actions on this bidding course of is as follows:
Bidders can obtain the official copy of the bidding doc from the ETS Portal ranging from October 30, 2023, till November 13, 2023.
- A Pre-Bid Convention is scheduled for November 14, 2023, which can be the final date for potential bidders to submit their queries.
- The deadline for receipt of bids, which ought to embrace each the Technical and Monetary Bids, is November 21, 2023, at 14:00:00 IST.
- The opening of the Technical Bids is ready to happen on the identical day at 14:30:00 IST.
- For participation within the bidding course of, bidders should present an Earnest Cash Deposit (EMD), calculated on the price of INR 13.86 Lakh per MW.
This initiative by NTPC signifies a major step in direction of harnessing wind power to fulfill the nation’s energy necessities and drive sustainable power improvement in India.