1.1 C
New York
Saturday, January 11, 2025

Sempra Infrastructure Selects Vestas for 319 MW Wind Farm Development in Mexico


Studying Time: 1 minutes

Sempra Infrastructure, a Sempra subsidiary, has positioned a 319 MW order for the Cimarron wind farm in Tecate, Baja California, Mexico. That is the third part of the Energia Sierra Juarez Wind Complicated.

With a mixed capability of 582 MW, the venture will characteristic 46 V163-4.5 MW generators and 18 V162-6.2 MW generators provided and put in by Vestas. Moreover, Vestas will present a 10-year service settlement (AOM 5000) to optimize vitality manufacturing and guarantee long-term operational stability for the wind farm.

Supply of generators is deliberate for This autumn of 2024, whereas commissioning is predicted for This autumn of 2025.

“We’re proud to have been awarded a venture by Sempra Infrastructure in Mexico, strengthening our long-standing relationship with this vital participant within the renewable vitality ecosystem. Now we have been in a position to win belief from our clients in Latin America due to our dependable product providing and native workforce with sturdy execution and servicing capabilities. With the signing of this new contract, we consolidate our market place in Mexico and reinforce our dedication to the event of renewable vitality within the nation”, mentioned Mehdi Hadbi, Senior Enterprise Director for Vestas in LATAM North.

Mario Barreiro Castellanos, Nation Head for Vestas in Mexico, added, “Our workforce has at all times labored dedicatedly, intensively and tirelessly, at all times investing within the nation regardless of any market challenges, because of the broad potential we determine in Mexico to tackle a number one function within the vitality transition journey”.

Related Articles

Latest Articles

Verified by MonsterInsights