Domi Eko Building

Serbia’s first photo voltaic panel producer, Domi Eko Photo voltaic has switched on a 150 MW TOPCon module manufacturing facility, in accordance with its gear provider – Italy-based Ecoprogetti.

The manufacturing facility is positioned in Velika Plana, in central Serbia, and depends on a semi-automated manufacturing line that’s reportedly capable of assemble and check as much as 25 panels per hour.

On the facility, Domi Eko Photo voltaic is producing TOPCon panels with an output starting from 430W to 550W.  They comprise both 120 or 144 half-cut M10 TOPCon cells.

Extra particulars on the module expertise and the manufacturing facility weren’t supplied.

Serbia is at the moment supporting photo voltaic by way of an public sale mechanism. The nation goals to put in 8.3 GW of PV by 2024, as outlined within the authorities’s draft plan. In keeping with the Worldwide Renewable Vitality Company (IRENA), Serbia’s put in PV capability stood at 137 MW by the top of 2022.

This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: editors@pv-magazine.com.