-5.3 C
New York
Thursday, January 9, 2025

Turkhan Power targets 24MW geothermal energy plant in Manisa, Türkiye



Turkhan Power has introduced the graduation of the deep drilling part for a 24-MW geothermal energy undertaking in Manisa, Türkiye.

Turkhan Petrol Mining and Power (Turkhan Power) has introduced the completion of floor research Manisa Salihli, Poyrazovasi in Türkiye. The mining and power firm will now proceed to the deep drilling stage, focusing on a 24-MW geothermal energy improvement.

The announcement was made by Ferdi Cobanoglu, Common Supervisor of Turkhan Power, on LinkedIn.

Based in 2012, Turkhan Petrol Madencilik ve Enerji has been lively within the iron and metal and mining sectors since its institution. Since 2015, the corporate has been working within the geothermal sector and has held three licences in Manisa – (1) 2019-IR-03 Saruhanli Gumulceli, (2) 2019-IR-04 Golmarmara Beyler, and (3) 2019-IR-05 Salihli Poyrazovasi Licensed fields.

After geothermal waters have been encountered in shallow gradient wells for exploration functions in these fields, MT research have been carried out by FNC and deep drilling places aiming excessive enthalpy have been decided. After the geological-geophysical research carried out in Salihli Poyrazova Licence, the corporate accelerated its actions for the 24 MW geothermal energy plant undertaking on this licence.

The primary research of the Poyrazova Licence overlaying an space of 4734,14 hectares have been interpreted and reported by Geothermex and Western Geco. In response to Cobanoglu, the Poyrazovas? geothermal discipline was analysed in two components, East and West, and it was said that the reservoir might be reached at depths of 1800-2500 m within the Japanese a part of the sphere and a geothermal energy plant might be established by reaching a possible useful resource of 24 MW with roughly 10 manufacturing and injection wells. Within the western a part of the sphere, the reservoir ranges shall be barely deeper, round 2000-2700 m, and a geothermal energy plant with an put in energy of 16 MW might be developed with roughly 10 wells.

The newest undertaking by Turkhan Power provides to a rising listing of geothermal investments and exploration works being completed within the Manisa Salihli area of Türkiye.

Supply:  Ferdi Çobanoglu (LinkedIn) through our Turkish language platform JeotermalHaberler



Related Articles

Latest Articles

Verified by MonsterInsights