3.5 C
New York
Friday, January 31, 2025

Vestas Secures 115 MW Venture in Sweden


Studying Time: 1 minutes

Vestas has secured an order from OX2 Building AB for the Anglarna wind challenge situated in Sweden. The order contains 18 V162-6.2 MW wind generators working in a power-optimized mode of 6.4 MW, protecting all the course of from provide and supply to the commissioning of the generators.

Put up-installation, Vestas will undertake the servicing of those generators by way of a 35-year Energetic Output Administration 5000 (AOM 5000) service settlement, aimed toward making certain the sustained optimum efficiency of the belongings. The supply of generators is anticipated to begin within the second quarter of 2026, and the commissioning course of is about to be finalized by the fourth quarter of the identical 12 months.

“We’re happy to construct upon our robust track-record to efficiently execute tasks with OX2. This challenge is one other nice instance of the collaboration with OX2 all through a few years, driving the power transition collectively,” stated Anna Schlasberg Wachtmeister, Vice President NCE Gross sales North and West at Vestas.

We’re completely happy to have signed the settlement with Vestas to produce generators for the Anglarna wind farm. It’s a nice challenge that may make a considerable contribution to part of Sweden with a robust demand for renewable power, and we look ahead to setting up the wind farm“, added Hillevi Priscar, Nation Supervisor, OX2. 

Related Articles

Latest Articles

Verified by MonsterInsights