12.2 C
New York
Saturday, November 16, 2024

Vestas Secures Maiden Order for V162-7.2 MW Turbine in German Venture


Studying Time: 1 minutes

Vestas secures its inaugural order for the V162-7.2 MW wind turbine prototype from Bürgerwindpark Janneby eG for the Janneby wind mission in Schleswig-Holstein, Germany. 

The prototype, put in on the Østerild Nationwide check middle in Denmark, undergoes intensive testing and verification alongside one other prototype to make sure reliability earlier than serial manufacturing begins.

The order contains the provision, supply, and commissioning of 1 V162-7.2 MW wind turbine. Vestas commits to servicing the prototype underneath a 20-year Lively Output Administration 4000 (AOM 4000) service settlement. The V162-7.2 MW, designed with the total worth chain in thoughts, boasts improved transportability of the nacelle unit and presents flexibility for servicing and upgrades all through its operational lifetime.

Turbine supply is slated to start within the first quarter of 2024, with commissioning anticipated to conclude within the second quarter of 2024.

“We’re excited to announce the primary V162-7.2 MW order for Vestas,” mentioned Nils de Baar, President of Vestas Northern and Central Europe. “The V162-7.2 MW is a part of our EnVentus platform household and options versatile ranking, designed to ship optimised power manufacturing even with higher temperature and local weather variations. We thank Bürgerwindpark Janneby for his or her belief and collaboration that allow us to carry out rigorous testing of our new turbine to make sure optimised reliability.”

Jörg Peter Thordsen, board member of Bürgerwindpark Janneby eG, added, Because the operator of Germany’s largest pilot wind turbine check and certification web site, we’re proud to construct the Vestas V162-7.2 MW at our wind park. We’re happy to have the ability to take part within the growth of this subsequent technology of wind generators.”

Related Articles

Latest Articles

Verified by MonsterInsights